The water supply and drainage project in the central part of Tianjin Port DongjiangIssuing time:2023-09-07 11:08 The rainwater pumping station in the starting area of the Jinnan Port Textile Industrial Park is a subproject of the municipal infrastructure project in the starting area of the Nangang Textile Industrial Park, Binhai New District, Tianjin. Zhonglin Tianjin Electromechanical Equipment Engineering Company, a subsidiary of the group, participated in the investment and construction of the rainwater and sewage joint construction pumping station project in the starting area. The station is located at the northeast corner of the intersection of Qingjing 1st Road and Qingwei 3rd Road, covering an area of 4,200 square meters. It mainly includes the rain and sewage pumping station of the combined rain and sewage pumping station, the inlet pipeline of the pumping station and the outlet pipeline of the pumping station: the inlet pipeline of the pumping station: rainwater 2.6*2.6m square culvert 24m, sewage D1000mm reinforced concrete pipeline 14m; part of the pumping station (lower main body, upper substation for power distribution, courtyard walls, gates, courtyard roads, etc.), including rainwater pumping station design flow 13.7m³/s; sewage pumping station design flow 0.45m/s; pumping station Outlet pipeline (outlet well ~ recent exit Banqiao River): Among them, the rainwater D2400mm prestressed reinforced concrete outlet pipe is 1,104m, and the sewage D800mm prestressed reinforced concrete outlet pipe is 573m. Relying on our company's advanced environmental protection technology and products, the drainage problem in this area has been solved reasonably and efficiently, and we will continue to provide quality services. 。 |