The drainage project of Tianjin Nangang Old Fair Wharf was successfully completedIssuing time:2023-09-07 11:12 The project is an important basic supporting project in Nangang Industrial Zone, which mainly serves production or storage enterprises in the zone and surrounding areas. At present, the first phase of the project has been basically completed and is expected to be put into use early next year. It is reported that the first phase of the project will build three new berths, with the largest berth of 50,000-ton ships. The main types of cargo transported are refined oil and liquid chemical products. The berth has a designed annual throughput capacity of 4.56 million tons. A petroleum and chemical storage tank area with a total storage capacity of 350,000 cubic meters will be built in conjunction with the terminal project, with an annual shipping capacity of about 8 million tons. The drainage plan and drainage equipment provided by our company for the project played an important role in the overall project. The main equipment was installed in mid-November 2014. At present, the equipment is in stable and reliable operation. |